Welcome

Kurton's where established in 1962 and have for been a family business providing the highest levels of service to its costumers for over 50 years. We provide a comprehensive design and build service, delivered by our established and well qualified work force, who are committed to providing a seamless design, installation and hand over of projects, with a professional yet personal touch.

Range of Services

 

  • Commercial mechanical services contractors & consultants
  • Specialising in the leisure sector & care homes
  • Mechanical design & build
  • Energy efficient controls
  • Traditional & modern heating systems
  • Air conditioning
  • Heat recovery solutions
  • Supply & extract ventilation
  • Ground source & air source heat pumps
  • Commercial kitchen canopies
  • Kitchen odour and particulate control
  • Noise control
  • Hot water generation
  • Plumbing services
  • Sanitary ware installations
 
 
Plumbing & Heating

Traditional wet heating systems, under floor heating, fuels: natural gas, propane (LPG) oil, solid fuel, renewables. Efficient boilers and controls.

More Details
Plumbing & Heating
Air Conditioning
& Ventilation

Multi air conditioning systems, split air conditioning systems, air handling, heat recovery, filtration, trade kitchen systems, odour control, sound attenuation.

More Details
Air Conditioning & Ventilation
Mechanical
Consulting Engineers

Site surveys & reports, preparation of budgets and costs, production of tender documents, CAD drawings.

More Details
Mechanical Consulting Engineers
History

Learn more about Kurtons history over the last 50 years, founded in 1962 by Arthur William Kurton.

More Details
History
 
Latest News

  M J KURTON LTD BECOME MITSUBISHI ELECTRIC AIR CONDITIONING ACCREDITED INSTALLERS

M J Kurton Ltd are delighted to announce we are now "Mitsubishi Electric Accredited Installers."

Mitsubishi Electric are always seeking to deliver the highest possible standards in equipment supply and workmanship. The Mitsubishi Electric Partner Program helps Partners to achieve the high standards of installation commissioning and aftercare services expected by today’s customers.

The program also considers Health and Safety issues and Corporate Social Responsibility (CSR) policies to be extremely important and is why that, in addition to adhering to their technical standards, all Partners are also required to uphold given Health & Safety issues and to abide by a set of CSR principles.

Corporate Event Motor Sport

At the 5th round of the British GT Championship recently held at Silverstone, Kurton's played a small part in sponsoring the Complete Racing Aston Martin GT4, driven by Steve Chaplin and Mike Kurton.

Kurton's guests where entertained in the SRO VIP hospitality suit, and where able to visit the Complete Racing pit to take a closer look at the car, and talk with the team and drivers.

Guests where also ale to take part in the GT and Formula 3 grid walks, getting a close up view of all the cars as they where formed up on the grid prior to the start of there races.

 Some of Our Recently Acquired Contracts

The Poachers Pocket, Chirk. Started December 2012 an extension and full refurbishment of a public house for Marston's. Works include the design of all mechanical services, new heating, hot and cold water systems, kitchen canopy and ventilation, sanitary ware and above ground drainage.

The Boat House, Shoreham. Started March 2013 a full refurbishment of a newly acquired public house for Marston's. Works include the design of all mechanical services, new heating, hot and cold water systems, kitchen canopy and ventilation, sanitary ware and above ground drainage. 

The Hollow Tree, Bristol. Started January 2013 a refurbishment of a newly acquired public house for Marston's. Works include alteration of the existing heating, hot and cold water systems, new trading area sanitary ware, new kitchen canopy and ventilation.

Some Of Our Recently Completed Contracts
 
The Coach & Horses, Kew. Completed March 2013 a refurbishment of a public house and 31 bed hotel for Young's. Works include alteration of the existing heating, hot and cold water systems, new VRF air conditioning to the trading areas, new trading area sanitary ware, new kitchen canopy and ventilation and the replacement of air conditioning systems to 31 hotel rooms.

The Guild Merchant, Preston
Completed December 2012 for Marston´s an existing site which has under gone and a complete re-development and extension of extension the trading area. We carried out the feasibility survey, mechanical design and costings. We installed new mechanical services consisting of heating & hot water plant, zoned heating systems, H & C water distribution, above ground drainage, general ventilation and the trade kitchen canopy and associated vent.ilation systems

The Talardy Hotel, St Asaph
Completed August 2012 for Marston´s the acquisition of site which has under gone and a complete re-development  of  the trading areas and hotel rooms. We carried out the feasibility survey, mechanical design and costings. We installed new mechanical services consisting of heating & hot water plant, zoned heating systems, H & C water distribution, above ground drainage, general ventilation and the trade kitchen canopy and associated ventilation systems.

 

 The Lobster Pot, Bridlington
Completed August 2012. An acquisition by Marstons extended and refurbished to create a new Milestone Rotisserie. Our works include the design of mechanical services and installation of heating, hot and cold water systems, kitchen canopies and ventilation, sanitary ware and above ground drainage ..

 The Wheatsheaf, London. Completed December 2012 a full refurbishment of an old public house for Young's closed for a number of months whilst Rail Track construct a new overhead railway line. Our works include the design of mechanical services, and installation of heating, hot and cold water systems, air conditioning, kitchen canopy with odour control and chilled supply air, cellar cooling and sanitary The Bulls Head, Chislehurst
Completed for Young & Co in April 2012 the creation of new luxury hotel rooms in previously un used areas of the first floor, 10 new rooms where created to add to the 5 existing rooms. We carried out the mechanical design installation, consisting of new VRF air conditioning to new all 15 rooms, hot water plant, H& C water services, above ground drainage, sanitary ware, and ventilation.